Standards applied in production

DIN 8077Pipe design and dimensions
DIN 8078General quality requirements and testing of PP pipes
DIN 16962Pipe joints and components for PP pressure pipes
DIN 16928Pipe connections and component layout
DVS 2207Welding regulations for plastic pipes
E-DIN 1988Drinking-water lines in premises

Properties of PP-R

Density0.9 g/cm³
Melt flow rate MFR (230°C / 2.16 kg)0.3 g/10 min
Coefficient of linear thermal expansion1.5 × 10⁻⁴ 1/K
Thermal conductivity0.24 W/mK
Modulus of elasticity (tension)900 MPa
Charpy impact, notched at +23°C20 kJ/m²
Charpy impact, notched at 0°C4 kJ/m²
Charpy impact, notched at −23°C2 kJ/m²

Independent tests on Pilsa Therm samples

  • Housing and Building National Research Center

    Pipe tests to DIN 8077/8078: dimensions, heat reversion, impact and hydrostatic pressure, plus UV-resistance testing of the black pipes.

  • Faculty of Engineering, Alexandria University

    Hydrostatic pressure testing of pipes and fittings at 150% of working pressure.

  • National Research Centre

    Material tests: tensile, density, melt flow and impact.

  • Faculty of Engineering, Mansoura University

    Pressure testing of pipes with their joints.

Test reports are available to consultants and contractors on request.

Every batch is inspected before storage

  • Dimensional control
  • Surface finish
  • Heat reversion test
  • Pressure testing

Heat-fusion welding, step by step

  1. Cut the pipe with PP-R scissors at an exact 90° angle. An electric saw is not preferred because it generates heat.
  2. Clean the pipe and fitting surfaces of any dirt or contaminants; they weaken the weld.
  3. Set the welding machine to 260°C and wait 5 minutes after it reaches temperature. Below 5°C ambient, increase heating time by 50%.
  4. Clamp the pipe and fitting to prevent relative movement during welding.
  5. Heat according to the table, then push pipe and fitting together in line and let them cool without twisting.
Outer diameter (mm)Welding depth (mm)Heating time (s)Welding time (s)Cooling time (min)
1613542
2014642
2516742
3218864
40201264
50231864
63262486
752830108
903040118
1103250128

Pressure test for the guarantee certificate

  • Visual check: all installed pipes and fittings are company products.
  • Confirm all fusion welds are correct and properly installed.
  • Seal all outlets with end caps and install the test pump.
101520 bar 10 min10 min 1 min10 min
  1. Fill the network and make sure water has reached all pipes and fittings.
  2. Raise the pressure to 10 bar and hold for 10 minutes.
  3. Raise the pressure to 15 bar and hold for 10 minutes.
  4. Raise the pressure to 20 bar and hold for 1 minute.
  5. Drop the pressure to atmospheric.
  6. Raise the pressure to 10 bar and hold for 10 minutes.
  7. With no leakage confirmed, the guarantee certificate is issued to the customer.

Have a project or a shop? Talk to us

Send your list of items and quantities and we will reply with a quotation.